A kitchen remodel typically requires a substantial amount of planning and work, regardless of the scale of such a project. Before beginning a kitchen renovation, you should develop an idea for the project’s design, set a kitchen remodeling budget and, of course, find a professional to assist you. Once you have made all these decisions, you may have questions regarding the logistics of your remodel. Here is a close look at this subject.
The kitchen is often considered a home’s centerpiece and is one of the rooms that houseguests generally notice first. Therefore, it is important to ensure that your renovation is visually appealing while also retaining your home’s functionality. A kitchen remodel typically consists of four major phases. Here is a close look at each of these stages.
The first step to take before starting a kitchen remodel involves searching for a contractor. There are several criteria you should look for when hiring a remodeling contractor, including licenses, credentials, and examples of previous work to get a sense of their consistency. It may also be a good idea to request testimonials from other clients, which may include references from friends or family members who have enlisted a contractor’s services.
After selecting a contractor, you should plan your vision for the remodel and gather all materials necessary for the project. This includes vanities, paint colors, lights, and remodeling permits (if needed). This can help ensure your renovation is carried out efficiently. If you are uncertain about which color combinations and patterns to use, you can ask a design specialist for recommendations. If there are any materials you need to order, be sure to do so well before your project is scheduled to begin.
Modifications within your existing exterior walls typically take time (up to 2 months in certain cases). The demolition stage includes the removal of your current flooring, cabinets, countertops, and appliances. It may be helpful to label the backs of all drawers and cabinets so that you know where their replacements will go. If you need to remove large appliances, such as a refrigerator, it is best to use a dolly. You should also verify that your contractor turns off the electricity in your kitchen at the breaker box in order to avoid electrocutions.
Once the demolition is complete, the installation of new materials may begin. It typically takes less than a week to install essential fixtures such as electrical, plumbing, and HVAC systems. You can then move on to install your new floor, which can be made of one of several types of durable materials such as hardwood, vinyl, ceramic tile, or linoleum. After the new flooring has been installed, you may replace your cabinets and countertops. The former should be fitted to make sure they are not installed unevenly. This should take between 3 and 5 days.
Meanwhile, countertops take only 1 to 2 days to install. If your countertops need to be fabricated, this may take anywhere between 1 and 4 weeks, depending on the type of material (granite, marble, concrete, etc.). The final aspect of your remodel includes the backsplash installation, which takes just 1 or 2 days, depending on the material and the complexity of your chosen design.
All in all, a kitchen remodel usually takes between 3 and 5 months on average. The exact duration of such a project often depends on several factors, including the size of the kitchen, the extent of the demolition, and whether certain materials need to be custom-made. Be sure to maintain frequent and effective communication with your contractor, as this will also help ensure your remodel is carried out efficiently.
Reach out to the experts at Monumental Contractors in Washington, DC, for more information on the timeline for a kitchen remodel. We are a family-owned-and-operated contracting company that is dedicated to serving the DC Metro Area. We strive to uphold our core values of integrity, quality, accountability, and respect in every project we undertake.
The team at Monumental will always strive to improve your kitchen’s visual appeal while maintaining its functionality. Our remodeling process always follows the same format. It begins with an initial consultation with one of our design and construction professionals, so that we may grasp your vision for the project. Once the design agreement has been ratified, we will gather all of your selections for the remodel, including lights, flooring, vanities, and paint colors.
A pre-construction meeting will then be held to discuss the project’s timeline and other logistics. The construction phase may then begin and a quality check will be performed. The process concludes with a final walk-through inspection to ensure that every question has been answered.
Ready to start your kitchen remodeling project? Give Monumental Contractors a call at (703) 552-9626 or book an appointment online to get started today.